An engineering evaluation of the 220/33kV reticulation system of the DRC Tenke Fungurume Copper mining operations to evaluate the 33kV Power Factor (PF) and to provide an engineering consultation service regarding the additional Power Factor Correction (PFC) required to improve the existing 33kV PF to a PF ≥ 0.96 and the associated current and voltage harmonic distortions

Deliverables:

  • Single line development using ETAP® package;
  • PFC and Harmonic Filter Design
  • Compiling the preliminary report which included high level design specifications.