Luggage Point Wastewater Treatment Plant – HV Studies

slider-3-watertreatment

PROJECT DETAILS

Client: Queensland Urban Utilities

Project Partner: Witthoft Engineering

Location: Main Beach Road, Pinkenba, in SE Queensland

Voltage: 11/3.3/0.415kV

Activity: Sewerage Treatment, Total Daily Peak Design Capacity >100,000EP

Project Status: Completed

Scope of Work
  • Power System Analysis of the Luggage Point Sewerage Treatment Plant
  • Modelling of HV system
  • Harmonic Power Flow
  • PFC
  • Short Circuit Studies (system size = 50 Buses) &
  • RPEQ Sign Off.

SIMILAR PROJECTS

Power Engineering Services for Wastewater Treatment Facilities