Oxley Creek Wastewater Treatment Plant

slider-3-watertreatment

PROJECT DETAILS

Client: Queensland Urban Utilities

Project Partner: Witthoft Engineering

Location: Donaldson Road, Rocklea, in SE Queensland

Voltage: 11/0.415kV

Activity: Sewerage Treatment Total Daily Peak Design Capacity >100,000 EP

Project Status: Completed

Scope of Work
  • Power System Analysis of the Oxley Creek’s Sewage Treatment Plant
  • Modelling
  • Power Flow
  • PFC
  • Short Circuits
  • Protection Coordination
  • Arc Flash Studies
  • Cable Schedule (system size = 726 Buses) &
  • RPEQ Sign Off.

SIMILAR PROJECTS

Water Engineering ServicesDedicated to Technical Excellence