Sandgate Wastewater Treatment Plant

Power Engineering Services for Wastewater Treatment Facilities

PROJECT DETAILS

Client: Queensland Urban Utilities

Project Partner: Witthoft Engineering

Location: Bicentennial Road, Boondall, in SE Queensland

Voltage: 11/0.415kV

Activity: Sewerage Treatment, Total Daily Peak Design Capacity 50,000 – 100,000EP

Project Status: Completed

Scope of Work
  • Power System Analysis of the Sandgate Wastewater Treatment Plant
  • Modelling of the HV System
  • Power Flow
  • PFC
  • Short Circuits
  • Protection Coordination
  • Arc Flash Studies
  • Review of the HV and LV Systems
  • Cable Schedule (system size = 289 Buses) &
  • RPEQ Sign Off.

SIMILAR PROJECTS