PROJECT DETAILS

Client: Doosan GridTech

Location: 400 kilometres north-west of Brisbane, Queensland

Voltage: 132/33kV

Battery Energy Storage System: Discharge capacity of up to 100MW is envisaged

Project Status: Completed

Scope of Work

Advisory services for Grid Connection Studies for the 100MW BESS in Wandoan:

 

  • Grid Connection Studies
  • Detailed Review prior to submission to Powerlink and AEMO
  • Voltage control strategy (advice)
  • Harmonic Analysis Methodology (advice)
  • Undertake Dynamic Analysis in PSSE for Partial Load Rejection Clause.