Purpose
We will determine if your substation grounding grid design is safe. We will limit touch and step potential to values below recommended limits for safe operation and protectio...
Purpose
We will undertake advanced power system studies to determine the feasibility of generator connection to the distribution network. The modelling process will include several t...
Purpose
We will model all protective devices in your system including Fuses, MCBs, MCCBs, ACBs and modem digital protection relays. The protection coordination study will:
...
Purpose
We will determine the impact of motor starting throughout the power systems. The motor acceleration study will:
- Determine voltage drops during motor-sta...
Purpose
We will identify, analyse harmonics generated by non-linear equipment. The study will determine if your facility exceeds the power supply authority limits. We will then deter...
Purpose
Depending on your needs, we will evaluate and confirm the rating of your components such as cables and transformers to ensure that they are adequately rated for load current....
Purpose
Depending on your needs, we will evaluate and confirm the rating of your components such as cables and transformers to ensure that they are adequately rated for load current....
Purpose
We will determine fault levels throughout the power systems. The short circuit study will be used to:
- Calculate minimum and maximum fault levels through...